Skip to main content

Documentation of Construction of New Alumni Auditorium in Academic I; Sheet#1: Preparing floor for finishing, spreading gravel., May 1988

 File — Box: 25
Identifier: Job #1392

Dates

  • May 1988

Creator

Language of Materials

Collection material in English

Extent

20 cubic feet.

Physical Description

3

Repository Details

Part of the Division of Rare and Manuscript Collections Repository

Contact:
2B Carl A. Kroch Library
Cornell University
Ithaca NY 14853
607-255-3530
607-255-9524 (Fax)