Skip to main content

Estimated Construction Costs for Approach Roads to the Fort McHenry Tunnel Proposed by the Joint Venture. Plate V. Zollman Assoc., Inc. and Per Hall Assoc., Ltd., undated

 File — Box: 31, Folder: 17

Dates

  • undated

Creator

Language of Materials

Collection material in English

Extent

111 cubic feet.

1 folders.

1 mapcase folders.

Repository Details

Part of the Division of Rare and Manuscript Collections Repository

Contact:
2B Carl A. Kroch Library
Cornell University
Ithaca NY 14853
607-255-3530
607-255-9524 (Fax)